Design
The company provides design services for high-complexity transport and hydraulic infrastructure facilities (Consequence Class CC3), including:
- national highways;
- bridge structures;
- trunk water pipelines and hydraulic engineering systems;
- urban improvement and public space projects.
All projects undergo state expert review and receive positive expert opinions, confirming compliance with national building standards (DBN), as well as the reliability and safety of the proposed solutions.
Key Advantages
- CC3-class projects (highest level of responsibility)
- Experience in new construction and road rehabilitation along entire routes
- Experience in post-war infrastructure recovery
- Integrated engineering solutions: transport + hydraulic engineering + energy
- Experience working with public sector clients
- Full-cycle delivery: surveys → design → expert review
- Application of modern technologies:
- modelling (FEM analysis, hydraulic calculations);
- integration of engineering networks;
- life-cycle optimization of infrastructure assets.
Project Examples
1. Trunk Water Pipelines and Hydraulic Engineering Systems
Inhulets – Pivdenne Reservoir Water Pipeline (Kryvyi Rih)
Dnipropetrovsk region
New construction (design adjustment)
Consequence Class: CC3
The project was implemented as part of the emergency response to the destruction of the Kakhovka HPP and to restore water supply to the Kryvyi Rih region.
Key characteristics:
- system capacity up to 400,000 m³/day;
- trunk pipelines with diameters Ø1000–1200 mm;
- total length ≈94 km.
Engineering infrastructure:
- pumping stations (Stages I, II, III);
- transformer substations;
- process chambers (distribution, air release, drainage), automation and dispatch control systems.
Key features: complex hydrogeological conditions; integration into the Kryvbas water supply system; ensuring environmental safety of the region.
Mine Water Discharge Pipeline (Inhulets River)
Dnipropetrovsk region
New construction
CC3
The project ensures controlled discharge of mine water; prevention of man-made accidents; stabilization of the regional water balance.
2. National Highways
H-12 Sumy – Poltava (Sumy bypass)
Sumy region
Major rehabilitation
CC3
Comprehensive road modernization including: pavement reconstruction; construction of interchanges; traffic management; engineering utilities and lighting.
3. Bridge Structures (National Roads)
Bridge over the Desna River (M-01 Kyiv – Chernihiv)
Chernihiv region
Major rehabilitation (design adjustment)
CC3
Key parameters:
- total bridge length over 600 m (combined sections);
- structure steel-reinforced concrete, composite system;
- number of spans up to 8+;
- design speed 110 km/h.
Features: complex spatial configuration; ensuring uninterrupted traffic; upgrading to modern load requirements.
Bridge over the Zamhlai River (H-27 Chernihiv – Mena – Sosnytsia)
Chernihiv region
Major rehabilitation
CC3
Characteristics:
- approach length ~260 m;
- modern parameters of Category I-b road;
- new asphalt concrete pavement;
- reconstruction of the superstructure.
Bridge over a Canal (Ivanivka village, M-01)
Chernihiv region
Major rehabilitation (post-damage)
CC3
Features: reconstruction after destruction in 2022; replacement of superstructures; restoration of supports and foundations; structural strengthening.
Bridge over the Bilous River (M-01)
Chernihiv region
Major rehabilitation
CC3
Key solutions:
- reconstruction of a ~48 m bridge;
- widening of the carriageway;
- pavement upgrade;
- increased load-bearing capacity.
4. Urban Infrastructure and Public Space
Improvement of the Territory of the National Opera of Ukraine (Kyiv)
Major rehabilitation
The project includes reconstruction of pedestrian spaces; enhancement of the historical environment; improvement of tourist attractiveness.