Production
Lviv
Uzhorod
Ivano-Frankivsk
Chernivtsi
Ternopil
Rivne
Khmelnytskyi
Lutsk
Zhytomyr
Kyiv
Vinnytsia
Odesa
Mykolaiv
Kherson
Crimea
Zaporizhzhia
Donetsk
Luhansk
Dnipro
Poltava
Kharkiv
Sumy
Chernihiv
Kropyvnytskyi
Cherkasy
Pavlohrad city
(Ua) Завод - рекордсмен
Dnipro region
Production base, Village Mohyliv
Dnipro region
Production base, Village Pustovoytivka
Sumy region
Production base, Village Husachivka
Kyiv region
Berezan town
Kyiv region
Production base, the town of Mykolaiv
Mykolaiv region
Production base, Village Butenky
Poltava region
Production base, the town of Severodonets’k
Luhansk region
Odesa International Airport production base
Odesa region
Tsarychanka town
Dnipro region
Stepanivka village
Sumy region
Slavyanka village
Dnipro region
Vulcanesti town
Moldova
Odesa city
Odesa region
Khodovychi village
Lviv region
Shevchenkove town
Kharkiv region
Zhvyrka town
Lviv region
Production base, Village Pachena Balka
Dnipro region
Production base, Village Zelenyi Hai
Dnipro region
Production base, Settlement Melioratyvne
Dnipro region
Production base, Village Kryachky
Kyiv region
Derhachi town
(Ua) Завод - рекордсмен
Kharkiv region
Novomoskovsk town
Dnipro region
Production base, Village Novopoltavka
Zaporizhzhia region
Production base, the town of Tokmak
Zaporizhzhia region
The company has created the largest ACMP network in the country
Following the results of the first half of 2021, plants of the Highway-South Company set the next record - 2 million tons of asphalt concrete mixtures
The Highway-South Company has created the largest network of production bases in the country. In 2021 alone, their number increased from 18 to 26. The company currently has 17 asphalt concrete mixing plants. In 2021, 4 new production bases were opened: new MARINI TOP TOWER 3000 plants have been installed in the village of Khodovychi in the Lviv Region, and in the town of Melitopol in the Zaporizhia Region. Another new ACMP is in Pavlograd, Dnipropetrovsk Region, the MARINI TOP TOWER 4500, is the most powerful in Ukraine with the capacity of 340 tons per hour. The fourth new plant, the MARINI TOP TOWER 4000, with a capacity of 320 t/h is installed in the town of Dergachi in Kharkiv Region.
The total production amount of asphalt concrete mixtures at 18 plants of the Highway-South Company is 4220 tons per hour, and of concrete mixture plants - 853 m3 per hour. In 2021, the number of mixing plants for preparation of cement-treated crushed stone mixtures increased from 7 to 13. In addition, the company has 6 concrete mixing plants. Thanks to the developed production network, the company uses exclusively its own construction mixtures in the road construction process. This allows the Highway-South Company to guarantee the impeccable quality of the road surface and to take a stable leading position in the market.
The total production amount of asphalt concrete mixtures at 18 plants of the Highway-South Company is 4220 tons per hour, and of concrete mixture plants - 853 m3 per hour. In 2021, the number of mixing plants for preparation of cement-treated crushed stone mixtures increased from 7 to 13. In addition, the company has 6 concrete mixing plants. Thanks to the developed production network, the company uses exclusively its own construction mixtures in the road construction process. This allows the Highway-South Company to guarantee the impeccable quality of the road surface and to take a stable leading position in the market.
24
PRODUCTION BASES
3550
T/Y TOTAL ACMP POWER
Production bases
Dnipro region
Devladove village
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Novomoskovsk town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Pashena Balka village
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit ENH – capacity 20 t/h
Pavlohrad city
Asphalt plant MARINI TOP TOWER 4500 – capacity 340 t/h
Bitumen modification unit ENH – capacity 20 t/h
Production base, Settlement Melioratyvne
MARINI coldFALT 400 mixing plant. Output is 400 t/h
Production base, Village Mohyliv
Simem Eagle 5000 concrete plant. Output is 135 m3/h
Production base, Village Pachena Balka
MARINI TOP TOWER 3000 asphalt concrete mixing plant. Output is 240 t/h
ENH bitumen modification plant. Output is 20 t/h
Production base, Village Zelenyi Hai
MARINI TOP TOWER 3000 asphalt concrete mixing plant. Output is 240 t/h
MARINI modiFALT 20 bitumen modification plant. Output is 20 t/h
Slavyanka village
Asphalt plant Kredmash DS-168637 – capacity 160 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Tsarychanka town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Vilnohirsk town
Concrete plant Liebherr Betomix 4.5 – capacity 210 m³/h
Kharkiv region
Derhachi town
Asphalt plant MARINI TOP TOWER 4000 – capacity 320 t/h
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Shevchenkove town
Asphalt plant AMMANN Global 160 Quick – capacity 160 t/h
Kyiv region
Berezan town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Kyiv city
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Production base, Village Husachivka
MARINI coldFALT 400 mixing plant. Output is 400 t/h
Production base, Village Kryachky
MARINI TOP TOWER 3000 asphalt concrete mixing plant. Output is 240 t/h
MARINI modiFALT 20 bitumen modification plant. Output is 20 t/h
Vasylkiv town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Luhansk region
Production base, the town of Severodonets’k
MARINI TOP TOWER 3000 asphalt concrete mixing plant. Output is 240 t/h
MARINI coldFALT 400 mixing plant. Output is 400 t/h
MARINI modiFALT 20 bitumen modification plant. Output is 20 t/h
Lviv region
Khodovychi village
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Zhovkva town
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Zhvyrka town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Mykolaiv region
Production base, the town of Mykolaiv
LIEBHERR Betomix 4.5 concrete mixing plant. Output is 210 m3/h
Odesa region
Odesa city
Asphalt plant Kredmash DS-168637 – capacity 160 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Odesa International Airport production base
Goker GBS Compact 120 concrete mixing plant - 2 un. Output is 2*120 m3/h
MARINI coldFALT 400 mixing plant. Output is 400 t/h
Pershotravneve village
Concrete plant Liebherr Betomix 3.0 – capacity 130 m³/h
Poltava region
Production base, Village Butenky
LIEBHERR Betomix 3.0 concrete mixing plant - 2 un. Output is 2*134 m3/h
Sumy region
Production base, Village Pustovoytivka
MARINI coldFALT 400 mixing plant. Output is 400 t/h
Stepanivka village
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Volyn region
Liuboml town
Concrete batching plant Simem Eagle 4000 – capacity 110 m³/h
Zaporizhzhia region
Production base, the town of Melitopol
MARINI TOP TOWER 3000 asphalt concrete mixing plant. Output is 240 t/h
MARINI coldFALT 400 mixing plant. Output is 400 t/h
MARINI modiFALT 20 bitumen modification plant. Output is 20 t/h
MARINI emulFALT 15 bitumen emulsion preparation plant. Output is 15 t/h
Production base, the town of Tokmak
MARINI coldFALT 400 mixing plant. Output is 400 t/h
Production base, Village Novopoltavka
MARINI XPRESS 2500 asphalt concrete mixing plant. Output is 200 t/h
Zaporizhzhia city
Concrete plant Gokker GBS Compact 120 – capacity 120 m³/h
Moldova
Vulcanesti town
Asphalt plant MARINI TOP TOWER 3000 – capacity 240 t/h
Bitumen modification unit MARINI modiFALT 20 – capacity 20 t/h
Bitumen emulsion plant MARINI emulFALT 15 – capacity 15 t/h
Zerneshti village
Concrete plant Elkon Elkomix-35 Quick Master – capacity 30 m³/h
Soil mixing plant MARINI coldFALT 400 – capacity 400 t/h
Romania
Solonta town
Launched: May 2026
Румунія, м. Солонта (будівельне містечко, рембаза)
