M-09 Highway: Bridge in Rava-Ruska widened, making travel safer for drivers and pedestrians

Another important stage of the bridge reconstruction in Rava-Ruska has been completed. The new cast-in-place concrete deck slab has been installed, using 100 cubic metres of concrete.
The bridge now has a stronger, more modern and durable structure — and it’s also wider. The total width of the bridge crossing has increased from 14.3 metres to more than 17 metres.
The sidewalks have nearly doubled in width and are now 2.5 metres wide. A modern safety barrier system has also been installed to make pedestrian movement safer and more comfortable.
The reconstruction of the M-09 highway between Lviv and the Rava-Ruska–Hrebenne border crossing includes 10 bridge structures:
✅ 6 bridges, ranging from 18 to 24 metres in length, are being fully reconstructed with their structures completely replaced.
✅ 4 bridges are being replaced with reinforced-concrete culverts.
Work has already been completed on 9 of the 10 structures, and traffic has been restored. All major works on the final bridge in Rava-Ruska are scheduled to be completed by the end of this year.