At the Vita-Poshtova Interchange on the M-05 Kyiv–Odesa highway, we have completed the construction of the lower asphalt concrete layer on the approaches.
This has allowed us to move on to the next stage of works:
• installation of the kerb along the retaining wall;
• installation of cornice blocks;
• construction of cast-in-place sidewalks.
The following works are also ongoing at the site:
• construction of cast-in-place sidewalks on the bridge deck – on the right-hand side, the works are nearly complete, while work on the left-hand side is ongoing;
• installation of the safety barrier system;
• construction of the drainage system.
Expansion joints have already been installed on the cast-in-place deck slab, and waterproofing of the cast-in-place sidewalks has been partially completed.
We are now preparing to waterproof the bridge deck carriageway and proceed with asphalt paving!
🚩 As a reminder: in summer 2025, our company completed the first stage of construction of the Vita-Poshtova Interchange – the underpass and the roundabout on the Boyarka side. Drivers can now safely make turns or U-turns towards Kyiv.
Completion of the second part of the interchange – the U-turn “horseshoe” – will allow drivers travelling towards Kyiv to safely turn towards Boyarka.