N-31 Highway: Every Process Is Backed by Quality Control!

A modern highway is much more than just a layer of asphalt. It is a highly complex technological and engineering structure. Any failure to follow the required technology at any stage can lead to major problems in the future – problems that are extremely costly and difficult to fix.
That is why quality control is an essential part of every construction process. Our laboratory specialists are constantly present on site, taking samples and carefully checking the compliance of every layer of the road structure with the required standards.
We are launching a series of publications dedicated to the work of our quality control team during the construction of the final section of the N-31 highway, Dnipro – Tsarychanka – Kobeliaky – Reshetylivka.
Story One: Sand
Every day, 7,000–8,000 cubic metres of sand are delivered to the site and placed in the road embankment. One of the laboratory’s key tasks is to verify the quality of its compaction.
Any insufficiently compacted void in a sand layer can eventually lead to failure of the road foundation and deformation of the entire roadway.
Sand is tested using two methods:
Cutting Ring
A metal cylindrical ring of known volume is driven into the compacted sand layer. It is then carefully excavated, and the excess sand is trimmed level with the edges of the ring.
The samples are delivered to the laboratory, where they are weighed and dried. The dry density of the material is then compared with the specified requirements.
For each sand layer over a 500–600 metre section, more than 100 samples are typically taken and delivered to the laboratory.
Dynamic Plate
A circular metal plate is placed on the levelled sand surface. A rod with a movable weight is attached to the plate. An electronic sensor (accelerometer) records the settlement of the plate under impact, while the device calculates the dynamic deformation modulus.
These two methods measure different parameters.
The cutting ring determines physical density – how many grams of dry sand are contained in one cubic centimetre.
The dynamic plate determines mechanical stiffness – how many millimetres the foundation settles under impact.
At the same time, approximate correlation tables exist for these parameters for sandy soils. This means that the dynamic plate makes it possible to carry out rapid operational quality control of the sand layer directly on site.
And now to the most sensitive question: how often does our quality control team detect inadequate compaction?
According to our specialists, such cases may occasionally occur at the beginning of the works. However, as construction progresses, they become increasingly rare.
The quality control team is a tool that helps identify mistakes in time – and, most importantly, prevent them from happening again.