{"id":12506,"date":"2025-12-17T16:42:18","date_gmt":"2025-12-17T13:42:18","guid":{"rendered":"https:\/\/automagistral.com.ua\/?p=12506"},"modified":"2026-02-04T16:46:25","modified_gmt":"2026-02-04T13:46:25","slug":"avtotrasa-m-09-vlashtovano-novu-dorozhniu-osnovu-ta-asfaltobetonne-pokryttia","status":"publish","type":"post","link":"https:\/\/automagistral.com.ua\/en\/news\/avtotrasa-m-09-vlashtovano-novu-dorozhniu-osnovu-ta-asfaltobetonne-pokryttia\/","title":{"rendered":"M-09 Highway: widening has been completed on half of the 34-km section, with a new road base and asphalt pavement in place!"},"content":{"rendered":"<p><\/p>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">M-09 Highway: widening has been completed on half of the 34-km section, with a new road base and asphalt pavement in place!<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">The capital repairs of the international highway section between Lviv and the Rava-Ruska\u2013Hrebenne border crossing has been underway for only six months, yet the company has already completed the bulk of the works.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> 5 bridges are at the final stage, with monolithic bridge deck slabs already cast.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> 17 km of the highway have been widened, with the road base and asphalt pavement completed (temporary yellow markings divide the road into two equal parts, but in reality the new road already has three traffic lanes).<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> 9 culverts have been installed (with two more currently under construction), as well as 4 wildlife crossings measuring 1.5 \u00d7 2.0 m (to accommodate these crossings, the road level was raised by 2 m).<\/div>\n<div dir=\"auto\">Favourable weather conditions are currently allowing the project to continue without interruption.<\/div>\n<div dir=\"auto\">Widening works on the second half of the highway are ongoing.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t1b\/1\/16\/1f53a.png\" alt=\"\" width=\"16\" height=\"16\" \/><\/span> As a reminder, Automagistral-Pivden commenced the major rehabilitation of the of the M-09 highway on the section between Lviv and the \u201cRava-Ruska \u2013 Hrebenne\u201d border crossing.<\/div>\n<div dir=\"auto\">This is the main route from Kyiv to Warsaw and part of the Trans-European Transport Network (TEN-T). The length of our section under repair (from the village of Volia-Vysotska to the border crossing) is 33.4 km.<\/div>\n<div dir=\"auto\">Before the war, the EBRD carried out a road safety audit, an economic feasibility study, and environmental and social assessments. In 2020, Ukraine and the Bank signed a financing agreement covering a number of projects, including the overhaul of the M-09.<\/div>\n<div dir=\"auto\">During the war, the project became even more critical \u2013 traffic volume increased, and the road\u2019s condition worsened.<\/div>\n<div dir=\"auto\">Project scope includes:<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Widening the road outside settlements, adding an extra lane.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Adding acceleration and deceleration lanes on both sides near bus stops, intersections, and junctions.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Completely replacing the road base and installing a new three-layer asphalt pavement.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Dismantling and rebuilding six bridges, most of which are in emergency condition; four bridges will be replaced with concrete culverts, and a roundabout will be constructed.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Installing a stormwater drainage (and purification) system, as one does not currently exist.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> Building sidewalks, bike lanes, and noise barriers<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>M-09 Highway: widening has been completed on half of the 34-km section, with a new road base and asphalt pavement in place! The capital repairs of the international highway section between Lviv and the Rava-Ruska\u2013Hrebenne border crossing has been underway for only six months, yet the company has already completed the bulk of the works. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12515,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-12506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/comments?post=12506"}],"version-history":[{"count":1,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12506\/revisions"}],"predecessor-version":[{"id":12520,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12506\/revisions\/12520"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media\/12515"}],"wp:attachment":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media?parent=12506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/categories?post=12506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/tags?post=12506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}