{"id":12499,"date":"2025-12-18T16:38:34","date_gmt":"2025-12-18T13:38:34","guid":{"rendered":"https:\/\/automagistral.com.ua\/?p=12499"},"modified":"2026-02-04T16:42:15","modified_gmt":"2026-02-04T13:42:15","slug":"na-try-misiatsi-ranishe-terminu-vidkryto-rukh-na-ob-iznii-diliantsi-mista-vulkaneshty","status":"publish","type":"post","link":"https:\/\/automagistral.com.ua\/en\/news\/na-try-misiatsi-ranishe-terminu-vidkryto-rukh-na-ob-iznii-diliantsi-mista-vulkaneshty\/","title":{"rendered":"Traffic Opened on the Vulc\u0103ne\u0219ti Bypass, Part of the M3 Highway"},"content":{"rendered":"<p><\/p>\n<div dir=\"auto\">Three Months Ahead of Schedule: Traffic Opened on the Vulc\u0103ne\u0219ti Bypass, Part of the M3 \u201cChi\u0219in\u0103u \u2013 Comrat \u2013 Giurgiule\u0219ti \u2013 Romanian Border\u201d Highway!<\/div>\n<div dir=\"auto\">The official opening ceremony was attended by Deputy Prime Minister Vladimir Bolea, State Secretary for Road Infrastructure Nicolae Mindra, EBRD representative Alexandru Hronika, General Director of AND \u0218tefan Popa, as well as representatives of Automagistral-Pivden.<\/div>\n<div dir=\"auto\">\u201cFor the residents of the city, this means a higher level of safety and comfort on the streets, less noise and pollution thanks to diverting heavy trucks outside the city, as well as better protection of the urban road network,\u201d emphasized Minister Vladimir Bolea.<\/div>\n<div dir=\"auto\">\u201cFor many years, an intensive traffic flow passed daily through Vulc\u0103ne\u0219ti, negatively affecting road safety, infrastructure, and the quality of life of residents. The opening of the bypass means improved safety, reduced congestion, shorter travel time to the south of the country, and better connectivity between the capital, the border checkpoint and the Port of Giurgiule\u0219ti,\u201d noted \u0218tefan Popa.<\/div>\n<div dir=\"auto\">As reported by to the National Road Administration of Moldova (AND), works on the bypass began in August 2023 and were completed THREE MONTHS ahead of schedule thanks to the efficient performance of the contractor \u2014 Automagistral-Pivden.<\/div>\n<div dir=\"auto\">AND reports that this is the first time a contractor has delivered a major infrastructure project ahead of schedule and within the allocated budget!<\/div>\n<div dir=\"auto\">The Vulc\u0103ne\u0219ti bypass is approximately 8.5 km long. The project included:<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> construction of a new road between km 2+800 and km 8+580;<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> reconstruction of the existing section between km 0+100 and km 2+800;<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> construction of access roads;<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> construction of a bridge and an agricultural underpass at km 4+690;<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t33\/1\/16\/2705.png\" alt=\"\u2705\" width=\"16\" height=\"16\" \/><\/span> installation of drainage systems, street lighting, traffic signs, and implementation of road safety measures in line with European standards.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/tc6\/1\/16\/1f6a9.png\" alt=\"\" width=\"16\" height=\"16\" \/><\/span>More than 320,000 m\u00b3 of earthworks and over 65,000 m\u00b3 of embankments were completed.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/tc6\/1\/16\/1f6a9.png\" alt=\"\" width=\"16\" height=\"16\" \/><\/span>More than 38,000 tons of asphalt were laid, and over 96,000 m\u00b3 of cement-treated mixtures were used.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/tc6\/1\/16\/1f6a9.png\" alt=\"\" width=\"16\" height=\"16\" \/><\/span>Almost 5 km of safety barriers and 186 traffic signs were installed.<\/div>\n<div dir=\"auto\">Automagistral-Pivden also rehabilitated Zhukovskyi Street in Vulc\u0103ne\u0219ti and the old section of the M3 road, which had previously been used by heavy transport and had fallen into disrepair.<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Three Months Ahead of Schedule: Traffic Opened on the Vulc\u0103ne\u0219ti Bypass, Part of the M3 \u201cChi\u0219in\u0103u \u2013 Comrat \u2013 Giurgiule\u0219ti \u2013 Romanian Border\u201d Highway! The official opening ceremony was attended by Deputy Prime Minister Vladimir Bolea, State Secretary for Road Infrastructure Nicolae Mindra, EBRD representative Alexandru Hronika, General Director of AND \u0218tefan Popa, as well [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12502,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-12499","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/comments?post=12499"}],"version-history":[{"count":1,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12499\/revisions"}],"predecessor-version":[{"id":12505,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12499\/revisions\/12505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media\/12502"}],"wp:attachment":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media?parent=12499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/categories?post=12499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/tags?post=12499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}