{"id":12223,"date":"2025-09-25T14:40:18","date_gmt":"2025-09-25T11:40:18","guid":{"rendered":"https:\/\/automagistral.com.ua\/?p=12223"},"modified":"2025-10-02T14:45:30","modified_gmt":"2025-10-02T11:45:30","slug":"remontuiemo-stratehichnu-trasu-m-18-na-zaporizhzhi","status":"publish","type":"post","link":"https:\/\/automagistral.com.ua\/en\/news\/remontuiemo-stratehichnu-trasu-m-18-na-zaporizhzhi\/","title":{"rendered":"Repairing the Strategic M-18 Highway in Zaporizhzhia"},"content":{"rendered":"<p><\/p>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\"><\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">During the war, Automagistral-Pivden has been carrying out a number of projects in the region related to the protection of energy facilities. When the need arose to restore several sections of the M-18 highway, we stepped in to help.<\/div>\n<div dir=\"auto\">The road runs south from Zaporizhzhia to Stepnohirsk, where Ukrainian forces are repelling constant enemy attacks. This route is crucial for the logistics of military, medical, and humanitarian supplies, as well as for evacuations.<\/div>\n<div dir=\"auto\">Automagistral-Pivden was the only contractor that agreed to participate in the tender . No other company was willing to work in the frontline zone, where enemy guided bombs strike almost daily.<\/div>\n<div dir=\"auto\">The project involves patchwork repairs on three sections, totaling 3.3 km. We are milling the damaged road surface, partially replacing the road base, and laying two layers of fine-grained asphalt and arranging the shoulders. The asphalt mix is being supplied from our company&#8217;s plant in the neighboring Dnipropetrovsk region.<\/div>\n<div dir=\"auto\">The project employs 75 workers and 45 pieces of equipment. The work is scheduled to be completed next month.<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>During the war, Automagistral-Pivden has been carrying out a number of projects in the region related to the protection of energy facilities. When the need arose to restore several sections of the M-18 highway, we stepped in to help. The road runs south from Zaporizhzhia to Stepnohirsk, where Ukrainian forces are repelling constant enemy attacks. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-12223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/comments?post=12223"}],"version-history":[{"count":1,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12223\/revisions"}],"predecessor-version":[{"id":12233,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/12223\/revisions\/12233"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media\/12230"}],"wp:attachment":[{"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media?parent=12223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/categories?post=12223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/tags?post=12223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}