Projects

Bridge Over The Sula River

Poltava region, Ukraine
State: Finished

The 211-meter bridge over the Sula River connects Cherkasy and Poltava regions. Reconstruction began in 2021. A 520-ton steel truss span was launched. A new fully metal arch span 95 meters long was installed.

Works resumed in 2022. As a result of reconstruction, the bridge width was expanded from 6 to 9 meters, foundations of supports were strengthened, and new supports were constructed. A new steel superstructure was installed.