{"id":13522,"date":"2026-11-02T13:50:19","date_gmt":"2026-11-02T10:50:19","guid":{"rendered":"https:\/\/automagistral.com.ua\/?p=13522"},"modified":"2026-11-02T13:50:19","modified_gmt":"2026-11-02T10:50:19","slug":"mizh-budapeshtom-ta-bukharestom-robotu-zrobleno","status":"publish","type":"post","link":"http:\/\/automagistral.com.ua\/en\/news\/mizh-budapeshtom-ta-bukharestom-robotu-zrobleno\/","title":{"rendered":"Between Budapest and Bucharest: Mission Accomplished!"},"content":{"rendered":"<p><\/p>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">&#8220;Automagistral-Pivden&#8221; has successfully completed its scope of work as part of the construction of a 6.5-kilometer section of a new motorway between the cities of Oradea and Cluj-Napoca in Romania. Once again, we have demonstrated our master proficiency in executing large-scale earthworks.<\/div>\n<div dir=\"auto\">Key Figures:<\/div>\n<div dir=\"auto\">Topsoil stripping \u2014 89,000 m\u00b3<\/div>\n<div dir=\"auto\">Excavation \u2014 128,000 m\u00b3<\/div>\n<div dir=\"auto\">Embankment filling \u2014 586,000 m\u00b3<\/div>\n<div dir=\"auto\">Base layer installation (ballast\/crushed stone) \u2014 203,000 m\u00b3<\/div>\n<div dir=\"auto\">Slope filling with black soil \u2014 14,000 m\u00b3<\/div>\n<div dir=\"auto\">A defining feature of this new construction project was the use of local soils with insufficient bearing capacity. Consequently, this required extensive cement stabilization, with almost every successive layer of the road base needing treatment. The total volume of stabilization reached 510,000 m\u00b3.<\/div>\n<div dir=\"auto\">More than 100 of our employees worked on-site, utilizing over 50 pieces of heavy machinery, including 25 dump trucks, 5 excavators, 5 bulldozers, 8 soil compactors, 2 motor graders, 2 soil stabilizers (recyclers), and 2 cement spreaders.<\/div>\n<div dir=\"auto\">The project team is already preparing to launch construction on the first section (33.7 km) of the Arad\u2013Oradea expressway. This route is part of the strategic European corridor Via Carpathia, which will provide a road link connecting the Baltic, Black, and Mediterranean seas. The start of works is scheduled for the spring of 2027.<\/div>\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/tc6\/1\/16\/1f6a9.png\" alt=\"&#x1f6a9;\" width=\"16\" height=\"16\" \/><\/span> Project Background:<\/div>\n<div dir=\"auto\">In the autumn of 2025, &#8220;Automagistral-Pivden&#8221; joined the construction of a new 28.55-kilometer expressway on the route between Budapest and Bucharest. The contract value exceeds \u20ac150 million. The project is being implemented by the Romanian partners of &#8220;Automagistral-Pivden,&#8221; with our company being responsible for executing the comprehensive earthworks package on the 6.5-kilometer section.<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>&#8220;Automagistral-Pivden&#8221; has successfully completed its scope of work as part of the construction of a 6.5-kilometer section of a new motorway between the cities of Oradea and Cluj-Napoca in Romania. Once again, we have demonstrated our master proficiency in executing large-scale earthworks. Key Figures: Topsoil stripping \u2014 89,000 m\u00b3 Excavation \u2014 128,000 m\u00b3 Embankment filling [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":13527,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-13522","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/comments?post=13522"}],"version-history":[{"count":1,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13522\/revisions"}],"predecessor-version":[{"id":13530,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13522\/revisions\/13530"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media\/13527"}],"wp:attachment":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media?parent=13522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/categories?post=13522"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/tags?post=13522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}