{"id":13138,"date":"2026-06-30T09:55:02","date_gmt":"2026-06-30T06:55:02","guid":{"rendered":"https:\/\/automagistral.com.ua\/?p=13138"},"modified":"2026-07-12T09:58:18","modified_gmt":"2026-07-12T06:58:18","slug":"rozv-iazka-u-viti-poshtovii-vlashtovuiemo-monolitnu-estakadu","status":"publish","type":"post","link":"http:\/\/automagistral.com.ua\/en\/news\/rozv-iazka-u-viti-poshtovii-vlashtovuiemo-monolitnu-estakadu\/","title":{"rendered":"Vita-Poshtova Interchange: Casting the Monolithic Bridge Deck!"},"content":{"rendered":"<p><\/p>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\"><\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">At the Vita-Poshtova interchange on the M-05 Kyiv\u2013Odesa Highway, the first stage of concreting the central bridge span has been successfully completed. More than 560 m\u00b3 of concrete has been placed.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">To prevent moisture loss while the concrete gains strength, the deck surface was treated with a special curing compound that forms a protective film. A monitoring system with embedded sensors has also been installed to continuously track the concrete\u2019s temperature and moisture throughout the curing process.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">The monolithic deck is curing under conditions that closely replicate those used in the factory production of precast reinforced concrete structures.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">By the end of this week, we plan to begin post-tensioning the deck of the central span.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\">We will explain how this process works in our upcoming posts.<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\"><span class=\"html-span xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs x3nfvp2 x1j61x8r x1fcty0u xdj266r xat24cr xm2jcoa x1mpyi22 xxymvpz xlup9mm x1kky2od\"><img loading=\"lazy\" decoding=\"async\" class=\"xz74otr x15mokao x1ga7v0g x16uus16 xbiv7yw\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/tc6\/1\/16\/1f6a9.png\" alt=\"&#x1f6a9;\" width=\"16\" height=\"16\" \/><\/span> As a reminder, in the summer of 2025, our company completed the first phase of the Vita-Poshtova interchange project \u2013 the tunnel and the roundabout on the Boyarka side. Since then, drivers have been able to make safe turns and U-turns towards Kyiv.<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>At the Vita-Poshtova interchange on the M-05 Kyiv\u2013Odesa Highway, the first stage of concreting the central bridge span has been successfully completed. More than 560 m\u00b3 of concrete has been placed. To prevent moisture loss while the concrete gains strength, the deck surface was treated with a special curing compound that forms a protective film. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":13141,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-13138","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/comments?post=13138"}],"version-history":[{"count":1,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13138\/revisions"}],"predecessor-version":[{"id":13144,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/posts\/13138\/revisions\/13144"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media\/13141"}],"wp:attachment":[{"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/media?parent=13138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/categories?post=13138"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/automagistral.com.ua\/en\/wp-json\/wp\/v2\/tags?post=13138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}